Tuesday, March 25, 2014

Glass


We have some finishing touches to make on our master bathroom (a rather significant amount of finishing touches), but really we are simply waiting on glass. 2 glass mirrors for the vanity and 1 glass door for the shower.  Given the flat, threshold free shower we are installing a frameless glass door.   We are hopeful that it looks right, fits right and that we can drill holes into the porcelain without cracking any of them.  During our waiting game, we are trying to decide what project will be next:  new garage, deck/patio, basement ???
 
 

Tuesday, March 18, 2014

What Problems?!


The tile in our master bathroom is finally done and sealed!  Trent cut and put it all in place, then he did the grout while I hurried along behind him wiping, wiping and still wiping up the excess.  If you've done tile work, you know exactly how enjoyable this job is.  We did happen to have a couple of minor issues during this project.  Thankfully, we've become masters at disguising/repairing/working through the issues.  We did learn something from this project:  while we LOVE the end result, we don't ever need to do this amount of tile (in one setting) again.  Ever. 

Sunday, March 9, 2014

Very Pleased

I'm very pleased with how the tile in our master bathroom is turning out.  Trent worked on it all week (during his evenings) and all weekend.  It's up and now we simply need to grout the entire room (I can actually help with this phase!).  Once that is dry and sealed, we can start putting the bathroom back together.  After our first tiled shower, Trent informed me he would NEVER tile another shower again.  This is our third tiled shower.  Personally, I think he's pretty good at it!

Thursday, February 27, 2014

Hardest Part is Done

It doesn't look like much has been accomplished in our master bath, but really the toughest part (for now) is done.  The awful cuts for the bathtub and strange corners are finished.  We might actually have a tile floor by the end of this weekend!

Thursday, February 20, 2014

Slow but Steady

Our master suite has been a very slow but steady process.  It's also been a process that leaves me almost useless to helping Trent.  I can paint and I can help unload cement board, but that's about my limit at this stage.  Building a shower floor that has a perfect, consistent slant towards the drain is something I understand but have NO ability to produce.  Whew...good thing Trent can!  With any luck, we'll be starting on the title work early next week (and I can go back to being helpful).
Trent was able to install the shower drain (which I'm super excited about!).  When we lay the tile, we'll put tile over the top of it so it looks invisible.


Thursday, February 13, 2014

A Little Trick

I'll let you in on a trick that we've learned after many projects:  buy all the items you need PRIOR to starting the project.  Truthfully, we don't always have this luxury (time, money, pure coincidence can change it all in a heartbeat).  However, when we can buy it all ahead it saves us so much headache! 
For the master suite/bathroom project, we were able to purchase most items ahead.  For the bathroom, it was critical because several of the items were special order.  By having several weeks of prep time, we were able to shop the items and get some great deals!  We've done all our demo and new painting so that this weekend we can start putting the bathroom together.  Below are pics of our assembled pieces for this project.  The only item not pictured is a really cool teakwood bench (for the shower)....I'm hoping Trent knows where it's at, because I can't locate it right now.
1.  Tile Backer board:  Trent loves this brand and it's sometimes tough to locate.  We were lucky enough to score it on sale!
 2.  The shower drain (which will be flat, in the ground) that allows us to have the shower floor be completely flat to the bathroom floor....no step-in.  This should have been CRAZY expensive, but Trent found a guy in Florida who handmade it for a fraction of the cost (the downside is that he didn't speak much English).
 3.  The actual floor and shower wall tile.  It's 12"x24" and I LOVE it.
 4.  The 16" rain shower head - I refuse to take it out of the box and get fingerprints on it until we install it.  Once again, Trent found an amazing deal on this item (which is great since there was NO WAY we were going to spend the going rate for this item).
 5.  The granite for our sinks.  We have terrible luck with buying vanity tops...seriously, it's just comical at this point.  So we ordered this baby early!
6.  The stand alone bathtub (this may be my favorite item).

Tuesday, February 4, 2014

I Blame Pinterest

I blame Pinterest entirely for this current project.  The beginning plan was to just paint the master bathroom.  The second plan was to just replace the tile and paint in the master bathroom.  The third plan was to also remove the shower insert and tile that as well.  ONE HUNDRED plans later (and many hours on Pinterest), we have a fully demo'd bathroom.  While we are still disputing talking through exactly what the finished product will look like, the new stand alone tub came in and I think I'm going to love it!
 
 
**Sometimes we put new stuff in its place just to imagine what it will look like.  Yes, it means we have to move big items (like a tub) multiple times, but it's totally worth it.**

Friday, January 31, 2014

We Moved Again?

 
Okay - we didn't move to a new house just yet.  We moved out of our master suite...an entire 12 feet into one of the guest bedrooms.  Shockingly, this small move seemed to be just as much work as a full move. Above is what the guest bedroom looks like now.  Below is what it looked like a few weeks ago.  I know, I know...contain your excitement about the previous "drapes."
We have painted the master bedroom already, ripped out the gross, disgusting carpet and have started demo'ing the master bathroom.  Since we are both sharing the guest bathroom right now, I predict that the master suite will be done a little more quickly.  Below are some official before master bathroom pics.  I'm SO excited about how this room is going to turn out! I can hardly wait!

 


Thursday, January 23, 2014

Main Living Space = Done

That's right....our main (primary) living space is done. Mostly.  I mean I might change out a light fixture or two, but it's done.  Initially, we were going to move on to finishing the lower level.  However, we have since decided that the master suite needs a facelift.  We start demo'ing the master suite this weekend.  Below are some before/after shots of the main living space.
 
Before:
After:
Before:
After:
Before:
After:
Before:
After:
 Before:
 After:

 

 

Wednesday, December 18, 2013

Fireplace Upgrade


When we initially purchased this project house, we had no plans to remodel the fireplace.  Unfortunately, it just looked sad and old once we painted and put in new wood floors.  So, we took the old out and put the new in.  Below are the before, during and after shots.  We purchased the stone "stuff" at a local place in Granger and the mantel is a heavy, solid piece of wood (that we painted black).  We found a mill in Decatur, MI for the mantel and had the wood piece cut, planed and sanded there (all for the bargain price of approx. $100!).
We have loved all the upgrades, but this one has had the largest impact and was the cheapest (about $350 total).  If you have a fireplace and don't love it, only a few hundred dollars could change that.
Before:
During:
After:
I can even enjoy it from the kitchen!