Basement Progress



The basement has drywall and (in a few short days) should have primed walls - ready to be painted. It's so exciting! Trent has already started on the shower in the bathroom. We decided to tile it because there wasn't any way to get a shower insert through the front door and down the basement stairs...so I guess we really didn't decide anything. Either way, a tiled shower looks nicer (in my opinion). It takes several days of layering the floor portion of the shower to get the slope just right. So, it will still be quite some time before the tile even goes in (but that hasn't stopped me from shopping for the tile I want).
All in all, we are thrilled with how the basement is currently shaping up!

Thursday, July 26, 2012

Booby Trap


Bailey (cat) has been part of my life since 1999. He is the most nervous, scared-of-everything cat that I have ever met. However, true to his species he simply cannot avoid his curiosity. Our basement is in the process of being drywalled and it's entirely open to the main level. We knew that it was going to be messy, but we assumed Bailey would be far too scared to head into the basement. After finding little paw prints all over EVERYTHING, we decided to try and keep him out of the basement for this week. Eventually (after trying several other things) we were forced to booby trap the stairway. We stuck tape (with the sticky side out) across the stairs. I wasn't paying attention and heard a loud thump as Bailey came tearing into the main level. I'm guessing he got stuck (explaining why our perfect grid of tape is not quite perfect).
I will not surrender to a 10 lb. feline.

Sunday, July 22, 2012

Workin' Weekend


We spent the weekend working on the project house. It was long, difficult and (thankfully) rewarding! Trent worked on the basement. He had loads of tedious stuff to get completed before the drywall starts. (Drywall starts today at 8am) However, the electrical is entirely done, the plumbing is done, the old electrical is removed and new insulation is up everywhere.



While Trent worked in the basement, I spent my weekend outside trying to get the front landscaping to (at the very least) look like someone lives here. After a couple hundred dollars (a few plants, edging and mulch) and a LOT of shoveling, it looks acceptable. Not like a professional did it, but definitely better. We still have more exterior work to do, but this was a project I could mostly handle on my own.



Now we sit and wait for 4 entire days - while someone else does the drywall. What will we do with our time?!

Wednesday, July 18, 2012

More Progress



The framing in the basement is entirely done and the electrical is almost done. It's a good thing since the drywall starts at 8am on Monday morning. Drywall is generally the only thing we don't do ourselves. We purchase the drywall, we unload it and drag it into the house (piece by heavy piece). However, we use a professional to hang it. Yes, Trent has the ability to do drywall (me....not so much). We've found that this is the one job that we get our money's worth by paying a pro.

Sidenote (that just makes me happy): the drywaller came by this morning to give us a final estimate. He was in the project house when we first started the ENTIRE project (he did the drywall in the kitchen). His first words in the front door were, "Wow! I would have never guessed this house could look this good." Thanks!

Tuesday, July 10, 2012

Basement Framing





The basement is finally in the framing phase and we're both terribly excited. The basement was one large open space. We removed the paneled walls but decided the mustard yellow flooring could stay (we'll just put the carpeting right over it). We have divided it up into a storage space (that will remain unfinished), a full bathroom, a bedroom and a large family room. It will give this house an extra 1,000 sq ft (approx) of living space...and let me tell ya' that we need it. Now. Only a few more days of framing and then on to the electrical!





Sunday, July 1, 2012

We Sure Are Tired


The past 36 hours have been rather productive around here. We officially started on the basement. (By "we" I mean that I managed to have a completely packed weekend schedule that didn't allow me any time to work on the house.)
"We" were able to rent a hand concrete saw and cut through the basement concrete in order to start on the bathroom plumbing. "We" then shoveled out all the dirt that went through the entire trench and 36" deep for the sump pump. After that, "we" put together the plumbing for the shower, toilet and sink. To end it all, "we" mixed new concrete and covered it all back up.
"We" sure are tired.

Monday, June 25, 2012

Kitchen: Done!


Our kitchen is done. The living room is done. The 3 bedrooms on the main level are done. The half bathroom and full bathroom are done. Unfortunately, things still aren't decorated and furniture still is in a temporary place. Eventually that will all change.


While finishing up the main level, we started working on the landscaping. We have a little (okay, a LOT) more to do (both the landscaping and exterior). I refuse to post any exterior photos until things are slightly better.

We're hoping to start the basement within the next week. Below is a photo of the basement when we purcahsed the house. The basement was one large "fellowship hall" room. Within the near future it should become a family room, spare bedroom and full bathroom. Hopefully.

Sunday, June 17, 2012

Berry Pickin'


We've continued to work on some of the smaller details on the project house (as we prepare to tackle the basement). However, today we invited Ben and Vanessa Sanders over to pick some black raspberries in our "back 40." We thought there were a decent amount of berries when we first walked out. Turns out there were more berries than we were all willing to pick. It also turns out that Beckham (Ben and Vanessa's 1 year old son) could eat the berries faster than we could pick them. He was completely content to sit on the ground with a bucket of berries while the 4 of us kept picking. Hysterical!

Thursday, June 7, 2012

Appliances....finally!


As of tonight, we have all the kitchen appliances installed and working. We haven't had a functioning kitchen since we sold our last house on March 21st - it's been a long 10 weeks. The appliances are beautiful and I love 'em. Items to still be completed on the kitchen: tile backsplash, crown (on top of cabinets) and window treatments. In case you are wondering, the snack bar counter is solid maple and will eventually be a shade (or two) darker.

As for the exterior of the project house, we have done basically nothing. However, we recently realized that we have an entire raspberry patch in "the back 40." I've been watching closely and they are just about ready. Trent was kind enough to mow a little trail through the general area so that I can pick them without killing myself on the thorns.

Thursday, May 17, 2012

Moving In

As of late last night we have a kitchen sink, faucet and counter tops. Today, I spent a little time unpacking some of the kitchen boxes. It's been 7 weeks since we've had any type of kitchen. While we still don't have appliances (unless you count our little dorm refrigerator), it feels a little more like home.