Monday, December 22, 2014

Locks, locks and more locks

After a lot of framing (and by a lot, I mean 2,300 sq ft worth) and more electrical wires than my mind can comprehend, we are getting close to drywall.  While I dread drywall for the inevitable mess it creates, I love it because the end is in sight.  Not actually close, mind you, but it's in sight.
Our project has proven to be slightly more difficult with Niles (our new kitten). Since we are opening up the stairwell we had to remove walls up to the main level recently.  The lower level is a disaster and we didn't want little Niles to get hurt, so Trent created a door to block it off.
Niles was able to push through the door in seconds.  Trent then added two "locks."  Niles was easily able to turn the locks and open the door.
Trent then added a homemade childproof lock to the original lock.  So far, so good. Although Niles shoves his face into the cracks to let us know just how displeased he is (daily).
It's such a tough life.

Monday, September 15, 2014

Fall/Winter Project

We've officially started our fall/winter project: the basement.  The current plan is to finish about 90% of the 2,300 sq. ft....unless we change our minds.  There will be another poker room for my husband and his buddies (we're moving as fast as we can guys!) along with another bedroom, bathroom, family room and work out room.  I'm guessing that my Christmas wish list will include new furniture.

Thursday, August 14, 2014

The Deck that Didn't Collapse

We barely finished the new deck just in time to host a party (a large party...we're talking a couple hundred people). The night before the party I woke up from a horrible nightmare that the entire deck collapsed during our party. I told Trent about it and he just laughed. His thoughts: 1. The deck would not collapse since he built it correctly and 2. Even if it did, the thing is about 6 inches off the ground....no one will die.
Turns out, the deck did not collapse!  It held up just fine and we had a great party. Below are the before and after shots.
On to the next project...

Before: 
After:

Thursday, June 19, 2014

A Small Detour

Yes, we have still been slaving away on the project house.  However, we've had a couple of small detours (truthfully, some of them were not so small).  Long story short, we are back on track and have a lots of items checked off our to-do list.

1.  30 additional new sprinkler heads added to the "back 40" of our property.
2.  New retaining wall on the side of the house so Trent doesn't have to mow Mt. Everest.
3.  Old deck demolished and new deck started.
4.  All the 2x4's needed for framing our entire basement delivered and moved into place.

That's it!  That's what we have been up to the past 8 weeks.

This is the machine that allowed us to do the sprinkler addition without massive destruction.


This is the retaining wall we built.
This is what the old deck looked like (UGLY).
This is during the demo phase (pre-retaining wall).

And this is all the wood for starting the framing in our basement.






Monday, April 7, 2014

Completed Bathroom

 
Other than picking out towels and a few décor items, the master bathroom is done!  We are thrilled with how it turned out and just as soon as I have cleaned all the construction dust we will be equally thrilled to start using it.
Yes, the ceiling in the shower is wood (teak wood, to be exact).  I thought about making the title of this blog "Pinterest Made Me Do It"....because that is the truth.  We had no plans of making the shower ceiling wood.  Unfortunately, I stayed on Pinterest far too late one evening.
**Disregard the grainy look - that's the dust still not settled**
 
 

 




Tuesday, April 1, 2014

I'm in Love

Between our enormous shower head (16" to be exact), the shower handle and our teakwood bench, I am in love.  While I haven't had a chance to try it out, I'm confident that it's perfect!

Tuesday, March 25, 2014

Glass


We have some finishing touches to make on our master bathroom (a rather significant amount of finishing touches), but really we are simply waiting on glass. 2 glass mirrors for the vanity and 1 glass door for the shower.  Given the flat, threshold free shower we are installing a frameless glass door.   We are hopeful that it looks right, fits right and that we can drill holes into the porcelain without cracking any of them.  During our waiting game, we are trying to decide what project will be next:  new garage, deck/patio, basement ???
 
 

Tuesday, March 18, 2014

What Problems?!


The tile in our master bathroom is finally done and sealed!  Trent cut and put it all in place, then he did the grout while I hurried along behind him wiping, wiping and still wiping up the excess.  If you've done tile work, you know exactly how enjoyable this job is.  We did happen to have a couple of minor issues during this project.  Thankfully, we've become masters at disguising/repairing/working through the issues.  We did learn something from this project:  while we LOVE the end result, we don't ever need to do this amount of tile (in one setting) again.  Ever. 

Sunday, March 9, 2014

Very Pleased

I'm very pleased with how the tile in our master bathroom is turning out.  Trent worked on it all week (during his evenings) and all weekend.  It's up and now we simply need to grout the entire room (I can actually help with this phase!).  Once that is dry and sealed, we can start putting the bathroom back together.  After our first tiled shower, Trent informed me he would NEVER tile another shower again.  This is our third tiled shower.  Personally, I think he's pretty good at it!

Thursday, February 27, 2014

Hardest Part is Done

It doesn't look like much has been accomplished in our master bath, but really the toughest part (for now) is done.  The awful cuts for the bathtub and strange corners are finished.  We might actually have a tile floor by the end of this weekend!